INSP-Final Inspection | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PASS |
Forrest France
|
|
|
Final inspection and walkthrough passed, noted adjustments are complete.
|
INSP-Final Inspection | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PART |
Forrest France
|
|
|
Final pending installation of the remainder of field ceiling tile and coverage adjustments in the library at two overspaced pendents.
|
INSP-Sprinkler Rough-in | 9/19/2013 | 9/19/2013 | 9/19/2013 | P | PART |
Forrest France
|
|
|
Overhead work at the grid ceilings approved for cover.
|
Issue and Print Permit | | | 9/6/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/3/2013 | | 9/4/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/4/2013 | | 9/4/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/4/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/4/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 9/4/2013 | | 9/4/2013 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 9/4/2013 | | |
|
|
|
9-4-13 called Don - Curtis Fire permit ready and fee given ///dld
|
Application received | | | 9/3/2013 | | |
|
|
|
|