Case Summary | | | 4/4/2014 | | |
|
|
|
|
INSP-Final Inspection | 2/10/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
CHANGE STATUS TO (ISS) | | | 1/23/2014 | | DONE |
|
|
|
PER INSPECTOR 430 - CHANGE STATUS FROM FINAL TO ISSUE
|
INSP-Final Inspection | 1/3/2014 | 1/6/2014 | 1/6/2014 | A | PASS |
Forrest France
|
|
|
Fire alarm inspection and acceptance testing passed, permit finaled.
|
Issue and Print Permit | | | 9/5/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/5/2013 | | 9/5/2013 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 9/4/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 4 2013 10:43AM
|
Plan assigned to (Lee) | 9/4/2013 | | 9/4/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/4/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 9/4/2013 | | 9/4/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/4/2013 | | DONE |
Lee G Meredith
|
|
|
|