INSP-Final Inspection | 12/26/2013 | 12/26/2013 | 12/26/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 12/9/2013 | 12/10/2013 | 12/10/2013 | A | FAIL |
Troy Cobbley
|
|
|
All notification devices were tested today. Some corrections/additions/relocations are needed and have been identified on the city approved plans. Need correct batteries installed in the FACP, verify supervision of NAC panels, verify a/v's in pharmacy, need access controled egress doors connected to the facp, verify interconnection with the pre-action panel and need as-builts.
|
INSP-Conference | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | DONE |
Troy Cobbley
|
|
|
Brian and I went over review comments and other misc items
|
Plan assigned to (Lee) | 9/5/2013 | | 9/10/2013 | | DONE |
Lee G Meredith
|
|
|
|
Plan resubmittals received | | | 9/10/2013 | | |
|
|
|
9-10-13 received 2 applications,& 2 sets of plans sent to fire ///dld
|
Alarm Plan Check | 9/10/2013 | | 9/10/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/10/2013 | | DONE |
Lee G Meredith
|
|
|
Approved plans (as noted) taken to front desk.
|
Telephone call | | | 9/10/2013 | | DONE |
Christina Prado
|
|
|
called Brian to advise permit was ready and gave fees due
|
Permit Ready to Issue | | | 9/10/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 9/10/2013 | | 9/10/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 9/10/2013 | | DONE |
|
|
|
|
1st review completed | | | 9/5/2013 | | FAIL |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 9/5/2013 | | DONE |
Lee G Meredith
|
|
|
Emailed review comments to clients.
|
Miscellaneous action | | | 9/5/2013 | | DONE |
Lee G Meredith
|
|
|
Plans taken to front desk for processing.
|
Telephone call | | | 9/5/2013 | | |
|
|
|
9-5-13 called Brian Hodge permit needs picked up ///dld
|
Application received | | | 9/5/2013 | | |
|
|
|
|