Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR13-00468
StatusFinaled
Name LOCAL FIRE AND SECURITY
Site Address 999 N CURTIS RD
Project NameSt. Al's M.O.B.
Customer Number 
ePlanReviewNo
Description
Replace existing fire alarm system. Data Center in basement that has an existing pre-action system to remain as is. New FA system will monitor releasing panel. Elevators to be upgraded in December. Recall modules will be installed for future use. Existing system does not have capacity for recall. Not associated with a building permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/26/201312/26/201312/26/2013PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/9/201312/10/201312/10/2013AFAIL
DetailsTroy Cobbley
All notification devices were tested today. Some corrections/additions/relocations are needed and have been identified on the city approved plans. Need correct batteries installed in the FACP, verify supervision of NAC panels, verify a/v's in pharmacy, need access controled egress doors connected to the facp, verify interconnection with the pre-action panel and need as-builts.
INSP-Conference9/23/20139/23/20139/23/2013PDONE
DetailsTroy Cobbley
Brian and I went over review comments and other misc items
Plan assigned to (Lee)9/5/2013 9/10/2013 DONE
DetailsLee G Meredith
Plan resubmittals received  9/10/2013  
9-10-13 received 2 applications,& 2 sets of plans sent to fire ///dld
Alarm Plan Check9/10/2013 9/10/2013 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  9/10/2013 DONE
DetailsLee G Meredith
Approved plans (as noted) taken to front desk.
Telephone call  9/10/2013 DONE
DetailsChristina Prado
called Brian to advise permit was ready and gave fees due
Permit Ready to Issue  9/10/2013 DONE
DetailsChristina Prado
Inspection Record Card- Fire9/10/2013 9/10/2013 DONE
DetailsChristina Prado
Issue and Print Permit  9/10/2013 DONE
1st review completed  9/5/2013 FAIL
DetailsLee G Meredith
Miscellaneous action  9/5/2013 DONE
DetailsLee G Meredith
Emailed review comments to clients.
Miscellaneous action  9/5/2013 DONE
DetailsLee G Meredith
Plans taken to front desk for processing.
Telephone call  9/5/2013  
9-5-13 called Brian Hodge permit needs picked up ///dld
Application received  9/5/2013