INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 | P | PASS |
Craig D. Hanson
|
|
|
all devices tested and passed
|
Override - Parcel Holds | | | 10/3/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 10/3/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/3/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/2/2013 | | DONE |
Lee G Meredith
|
|
|
Received a phone call from Rob Ahten. He informed me that Pads 1 & 2 are now set to have wet sprinklers inside. The canopies are still dry. Also, they need to install Monitoring. No phone lines are available so wireless will be needed. He asked if this can be done on as builts. I informed hime that we will need a plan mod.
|
Plan resubmittals received | | | 10/2/2013 | | DONE |
|
|
|
started plan mod workflow
|
Alarm Plan Check | 10/2/2013 | | 10/2/2013 | | PASS |
Lee G Meredith
|
|
|
Plan Mod Approved
|
PLANS TAKEN FRONT DESK ALARM | | | 10/2/2013 | | DONE |
Lee G Meredith
|
|
|
Plan mod approved. ProjectDox updated.
|
Plan assigned to (Lee) | 9/9/2013 | | 9/9/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/9/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 9/9/2013 | | 9/9/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/9/2013 | | DONE |
Lee G Meredith
|
|
|
Plans approved per review comments. ProjectDox updated
|
Miscellaneous action | | | 9/9/2013 | | DONE |
Lee G Meredith
|
|
|
Note: Sprinkler system is currently a dry system. Canopy in front of building has sprinkler coverage as well. It is either tied to PAD 1 or PAD 2.
|
Inspection Record Card- Fire | 9/9/2013 | | 9/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 9/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 9/9/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 9/5/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2013 10:39AM
|