INSP-Final Inspection | 11/6/2013 | 11/7/2013 | 11/7/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 10/8/2013 | 10/9/2013 | 10/9/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead work at the grid ceilings.
|
Plan assigned to (Tim) | 9/11/2013 | | 9/12/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/12/2013 | | 9/12/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/12/2013 | | 9/12/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/12/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/12/2013 | | 9/12/2013 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 9/12/2013 | | |
|
|
|
|
Issue and Print Permit | | | 9/12/2013 | | DONE |
|
|
|
|
Application received | | | 9/11/2013 | | |
|
|
|
|