Miscellaneous action | | | 3/6/2014 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 10/4/2013 | 10/4/2013 | 10/4/2013 | P | PART |
Forrest France
|
|
|
Verified previous C/N items are finished. Overhead work approved for cover at the drop ceilings throughout the remodel area. Final pending remainder of field ceiling tile install.
|
INSP-Sprinkler Rough-in | 9/30/2013 | 9/30/2013 | 9/30/2013 | P | PART |
Forrest France
|
|
|
Overhead modifications at the grid ceiling areas okayed for cover. Provide verification calcs will support two heads fed by 1" pipe at the NE corner open office.
|
Issue and Print Permit | | | 9/16/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/11/2013 | | 9/12/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/12/2013 | | 9/12/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/12/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2013 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 9/12/2013 | | DONE |
Christina Prado
|
|
|
Left message advising permit is ready and gave fees due
|
Permit Ready to Issue | | | 9/12/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 9/12/2013 | | 9/12/2013 | | DONE |
Christina Prado
|
|
|
|
Case Summary | | | 9/11/2013 | | DONE |
|
|
|
|
Application received | | | 9/11/2013 | | |
|
|
|
|