INSP-Final Inspection | 11/26/2013 | 11/27/2013 | 11/27/2013 | P | PASS |
Forrest France
|
|
|
Fire alarm testing completed satisfactory. Permit final approved.
|
Miscellaneous action | | | 11/27/2013 | | DONE |
Lee G Meredith
|
|
|
Received electronic copies of as built drawings, central station monitoring report and record of completion. All files uploaded in ProjectDox and batch stamped.
|
Telephone call | | | 11/26/2013 | | DONE |
Lee G Meredith
|
|
|
Recieved a phone call from Charlie Bayne. He informed me that 2 strobes were moved a small amount and required a change in their candela setting to acommodate construction issues. I informed him that something this small could be submitted electronically as an as built condition and would not require a resubmittal. Charlie comfirmed that he would submit updated drawings.
|
Plan assigned to (Lee) | 9/18/2013 | | 9/18/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/18/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 9/18/2013 | | 9/18/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/18/2013 | | DONE |
Lee G Meredith
|
|
|
Plan approved. ProjectDox updated.
|
Permit Ready to Issue | | | 9/18/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 9/18/2013 | | 9/18/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 9/18/2013 | | DONE |
|
|
|
|
Application received | | | 9/17/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 17 2013 1:25PM
|