INSP-Final Inspection | 5/15/2014 | 5/16/2014 | 5/16/2014 | A | PASS |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in | 2/6/2014 | 2/6/2014 | 2/6/2014 | P | PART |
Forrest France
|
|
|
Okay for ceiling cover.
|
INSP-Final Inspection | 2/5/2014 | 2/5/2014 | 2/5/2014 | P | PART |
Forrest France
|
|
|
Overhead work approved for cover- plan modification verified.
|
Sprinkler Plan Check | 2/5/2014 | | 2/5/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2014 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 2/5/2014 | | DONE |
Christina Prado
|
|
|
Called Don to advise plan mod is ready with no fees due
|
Permit Ready to Issue | | | 2/5/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 2/5/2014 | | 2/5/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/5/2014 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/4/2014 | | 2/4/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 2/4/2014 | | DONE |
Christina Prado
|
|
|
Received additional three sets for plan mod #2
|
INSP-Sprinkler Rough-in | 2/3/2014 | 2/3/2014 | 2/3/2014 | P | FAIL |
Forrest France
|
|
|
Approved plans indicate a max. spacing of 16x16- Noted five locations overspaced at 9' from adjacent walls. Also need to verify materials in contact with CPVC piping are compatible per the mfg. listing such as fire caulk, duct mastic, and cables.
|
(F) Reprint permit | | | 2/3/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/3/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/30/2014 | | 1/30/2014 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 1/30/2014 | | |
|
|
|
1-30 -14 called Don permit ready and fee given ///dld
|
Permit Ready to Issue | | | 1/30/2014 | | |
|
|
|
|
Plan assigned to (Tim) | 1/28/2014 | | 1/29/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/29/2014 | | 1/29/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2014 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 1/28/2014 | | DONE |
Christina Prado
|
|
|
received three sets of revised plans for an intended plan modification to the existing approved plans
|
INSP-Sprinkler Rough-in | 1/24/2014 | 1/27/2014 | 1/27/2014 | A | NR |
Forrest France
|
|
|
Need to provide plan modification for resubmittal due to significant changes in the installation from original approved drawings. No approval for cover at this time.
|
INSP-Conference | 11/5/2013 | 11/5/2013 | 11/5/2013 | A | DONE |
Forrest France
|
|
|
Regarding revised calculations for field changes.
|
INSP-Sprinkler Rough-in | 11/4/2013 | 11/4/2013 | 11/5/2013 | P | PART |
Forrest France
|
|
|
UG fire supply line from the point of connection at the street to the stub-in okayed pending revised pipe size to 1 1/2" and elevation gain are included in the calcs. Need to ensure adequate cover (min. bury of 4'-6") is provided at the SW corner of the house near the patio and retainer wall section as discussed.
|
Issue and Print Permit | | | 11/4/2013 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 11/1/2013 | | 11/1/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2013 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 11/1/2013 | | DONE |
Christina Prado
|
|
|
called Don to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 11/1/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 11/1/2013 | | 11/1/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 9/25/2013 | | 11/1/2013 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 10/30/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/1/2013 | | 10/1/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/1/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/1/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Telephone call | | | 10/1/2013 | | |
|
|
|
10-1-13 Called Don - Curtis Fire permit needs to be picked up ///dld
|
Miscellaneous action | | | 9/30/2013 | | DONE |
|
|
|
Sent letter to Don Curtis Fire Sprinkler Services, Inc. and asked if this was dual service (domestic and fire water) Project, is on hold until this information is determined.
|
Application received | | | 9/25/2013 | | |
|
|
|
|