Case Summary | | | 1/30/2014 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 | P | PASS |
Craig D. Hanson
|
|
|
2nd floor duct detector tested and pass
|
Issue and Print Permit | | | 10/1/2013 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 9/27/2013 | | 9/30/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 9/30/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 9/30/2013 | | 9/30/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/30/2013 | | DONE |
Lee G Meredith
|
|
|
Approved planbs take to front desk for processing.
|
Telephone call | | | 9/30/2013 | | DONE |
Christina Prado
|
|
|
called Tim to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 9/30/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 9/30/2013 | | 9/30/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/27/2013 | | |
|
|
|
|