INSP-Final Inspection | 1/7/2014 | 1/10/2014 | 1/14/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 11/5/2013 | 11/6/2013 | 11/6/2013 | P | PART |
Forrest France
|
|
|
Inspection for ceiling cover completed at the 6th floor tenant area- Noted items include; overspaced coverage at office #4, missing head at the NE storage room, grid ceilings at the north training room are not yet installed. Remainder of work okayed for cover.
|
Plan assigned to (Tim) | 9/30/2013 | | 9/30/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/30/2013 | | 9/30/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/30/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2013 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 9/30/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/30/2013 | | 9/30/2013 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 9/27/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 27 2013 3:14PM
|