Case Summary | | | 4/4/2014 | | |
|
|
|
|
INSP-Final Inspection | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PASS |
Forrest France
|
|
|
Verified noted corrections are finished. Functional testing passed. Fire alarm permit finaled.
|
INSP-Final Inspection | 11/21/2013 | 11/22/2013 | 11/25/2013 | P | FAIL |
Forrest France
|
|
|
Missing SD at the new NAC, notification appliances are overspaced as installed.
|
Permit Ready to Issue | | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 10/10/2013 | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 10/10/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 10/9/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 9 2013 12:05PM
|
Plan assigned to (Lee) | 10/9/2013 | | 10/9/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/9/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 10/9/2013 | | 10/9/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/9/2013 | | DONE |
Lee G Meredith
|
|
|
Plans approved as noted. ProjectDox updated.
|