Permit NumberFIR13-00569
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4300 S KENNEDY ST
Project NameWESTERN AIRCRAFFT PARTS BUILDI
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of providing a new 6”x4”x2” grid system supplied through 8” underground, 6” backflow preventer and a 6” riser. The system is protecting a warehouse with four different commodities utilizing ESFR K=25.2 sprinklers. The commodities include Class I-IV 20’ high, tires stored on tread 25’ high, cartoned Group A unexpanded plastics on racks 20’ high and cartoned Group A expanded plastics 5’ high. The building is 18’-3” high to the bottom of the z purlins.

The underground was installed under permit FIR13-00439

Western Aircraft Parts Warehouse - To construct a new 13,730 square foot, one story, pre-engineered metal parts warehouse and office building. This permit also includes related site improvements. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/20/20141/21/20141/21/2014APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/14/20141/14/20141/14/2014PCANC
DetailsTroy Cobbley
Cancel per Rick Phone #: ###-####
INSP-Final Inspection1/13/20141/13/20141/13/2014PFAIL
DetailsTroy Cobbley
The exterior alarm bell needs to be repaired. All other items appear ok.
INSP-Sprinkler Rough-in/Hydro12/23/201312/24/201312/24/2013APASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro12/23/201312/23/201312/23/2013PFAIL
DetailsTroy Cobbley
Hydro test failed with visible drop in pressure at the guage
INSP-Supply line flush11/19/201311/19/201311/19/2013PPASS
DetailsTroy Cobbley
Underground flush passed. Also the overhead rough-in passed. Will need another rough-in inspection when the drops have been cut.
Miscellaneous action  11/5/2013 DONE
I received a list of chemicals without quantities. However, all of the chemicals fit within 3 storage cabinets. Therefore, it is assumed the quantities do not pose a problem.
INSP-Sprinkler Rough-in10/31/201311/1/201311/1/2013APART
DetailsCraig D. Hanson
This is cover inspection for hanger installation only. L bracket hangers inspected and pass. ok to cover. no piping inspected. CDH
Sprinkler Plan Check10/30/2013 10/30/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  10/30/2013 DONE
DetailsTim Frost
Permit Ready to Issue  10/30/2013  
Inspection Record Card- Fire10/30/2013 10/30/2013 DONE
DetailsDarla L Downs
Issue and Print Permit  10/30/2013 DONE
Sprinkler Plan Check10/22/2013 10/22/2013 FAIL
DetailsTim Frost
1st review completed  10/22/2013 FAIL
DetailsTim Frost
Miscellaneous action  10/22/2013 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)10/17/2013 10/17/2013 DONE
DetailsTim Frost
Application received  10/15/2013 DONE
Application submitted via PDS Online on Oct 15 2013 2:48PM