INSP-Final Inspection | 10/30/2013 | 10/31/2013 | 10/31/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/29/2013 | 10/30/2013 | 10/30/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide notification device in the new Breakroom.
|
Telephone call | | | 10/30/2013 | | DONE |
Scott Arellano
|
|
|
Spoke with the general contractor (John) whom was requesting a TCO. However, the remaining life safety issue has since been corrected and the installing contractor is preparing to call for a final inspection to test the fire alarm system. The addition of the single notification appliance in the break room may be added on the plans as an "as-built" change. These "as-built" plans must be provided to the field inspector for final inspection and delivered to City Hall records division for archiving after final inspection approval.
|
Plan assigned to (Lee) | 10/15/2013 | | 10/16/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/16/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 10/16/2013 | | 10/16/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/16/2013 | | DONE |
Lee G Meredith
|
|
|
Approved plans taken to front desk for processing.
|
Permit Ready to Issue | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
called EEG Idaho to advise permit is ready and gave fees due
|
Inspection Record Card- Fire | 10/16/2013 | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 10/16/2013 | | 10/16/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 10/16/2013 | | DONE |
|
|
|
|
Application received | | | 10/15/2013 | | |
|
|
|
|