Permit Information
Permit NumberFIR13-00571
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 1249 S VINNELL WAY
Project NameUSDA Warehouse GSA Phase 2 Bld
Customer Number 
ePlanReviewYes
Description
Quick Permit
Add 2 sprinklers for new office at existing warehouse area.

Scope of work to include adding 1 new office with new ceiling grid. and adding utility sink to existing bathroom. New 25 square foot storage room.Mechanical, electrical and electrical per plans. Interior finishes to be compliant with chapter 8, IBC.
This building was built in 1995 for Fish and Wildlife Fische # 971217. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Any racking installed will require a separate permit, review and approval prior to installing the racking system**AJS**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/10/201312/11/201312/11/2013APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in11/7/201311/8/201311/8/2013PPASS
DetailsTroy Cobbley
Rough-in passed. Piping is ok to cover.
FIR-Aging Inspection11/4/201311/5/201311/5/2013PCANC
DetailsTroy Cobbley
Anthony Phone #: ###-####
INSP-Sprinkler Rough-in11/1/201311/4/201311/4/2013PCANC
DetailsTroy Cobbley
Per Anthony work is not done yet. Rescheduled for tomorrow Phone #: ###-####
Permit Ready to Issue  11/1/2013 DONE
DetailsChristina Prado
Issue and Print Permit  11/1/2013 DONE
DetailsChristina Prado
Inspection Record Card- Fire11/1/2013 11/1/2013 DONE
DetailsChristina Prado
Plan assigned to (Tim)10/17/2013 10/17/2013 DONE
DetailsTim Frost
Sprinkler Plan Check10/17/2013 10/17/2013 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  10/17/2013 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/17/2013 DONE
DetailsTim Frost
Application received  10/16/2013 DONE
Application submitted via PDS Online on Oct 16 2013 12:53PM