INSP-Final Inspection | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Craig D. Hanson
|
|
|
|
Permit Ready to Issue | | | 10/21/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 10/21/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 10/21/2013 | | 10/21/2013 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 10/18/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2013 9:34AM
|
Plan assigned to (Lee) | 10/18/2013 | | 10/18/2013 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 10/18/2013 | | DONE |
Lee G Meredith
|
|
|
Elevator lobby does not show any notification. I emailed Dante to confirm that the elevator lobby is not within the scope of work. He replied and indicated that thist area is not located within their boundries.
|
1st review completed | | | 10/18/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 10/18/2013 | | 10/18/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/18/2013 | | DONE |
Lee G Meredith
|
|
|
Plans approved. ProjectDox updated.
|