Case Summary | | | 2/4/2014 | | |
|
|
|
|
INSP-Final Inspection | 11/18/2013 | 11/18/2013 | 11/18/2013 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Final Inspection | 11/12/2013 | 11/15/2013 | 11/18/2013 | P | PART |
Forrest France
|
|
|
Fire alarm work passed functional testing with the exception of missing trouble signal at the SD above the panel upon removal of the smoke head- To be repaired as discussed.
|
Issue and Print Permit | | | 10/28/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 10/25/2013 | | 10/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/25/2013 | | DONE |
Barbara Stitt
|
|
|
Called Brett and told him that permit is ready & fees due on 10-25-13 @ 8:30am//BAS
|
Application received | | | 10/24/2013 | | |
|
|
|
|
Plan assigned to (Lee) | 10/24/2013 | | 10/24/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/24/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 10/24/2013 | | 10/24/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/24/2013 | | DONE |
Lee G Meredith
|
|
|
Approved plans and review comments taken to front desk for processing.
|