Permit Information
Permit NumberFIR13-00597
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 601 W GOWEN RD
Project NameWPS Warehouse Expansion
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of reworking two systems and adding one new system. The system are gridded except for and existing shop building which is a tree. There is an existing 1500 Gpm @ 105 Psi Fire Pump. The grid systems are protected with ESFR sprinklers. The center section has a ceiling area above tire storage. The existing shop building and connector piece are bases on OH II the remainder of the building are based on high piled storage.

Western Power Sports - Warehouse Addition - To construct a new 60,000 square foot insulated tilt-up concrete warehouse addition to the south end of the existing building. The new addition will connect with an existing metal building to the west attaching it to the main building and creating one structure of 247,870 sq. ft. The south exterior wall of the existing metal building will be removed. An ESFR sprinkler system and suspended ceiling for in rack storage including tires will be installed. New accessible restrooms are also being construction at a portion of the existing warehouse, south of the wall at grid line D. This permit also includes related site improvements. This building is fully fire sprinklered. The sprinklers are used for area increase. This is an unlimited area building. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/15/20148/18/20148/18/2014APASS
DetailsForrest France
Fire sprinkler work passed final walkthrough.
INSP-Final Inspection8/14/20148/15/20148/15/2014APART
DetailsForrest France
Need to provide plan modification per inspection activity note dated 4/11/14.
INSP-Sprinkler Rough-in4/30/20144/30/20144/30/2014PPART
DetailsForrest France
Shop area overhead work passed rough-in inspection.
INSP-Sprinkler Rough-in4/10/20144/11/20144/11/2014PPART
DetailsForrest France
Need to provide plan modification to include additional heads and branchlines below ductwork in the new warehouse area.
INSP-Sprinkler Rough-in/Hydro3/7/20143/10/20143/10/2014PPART
DetailsForrest France
Overhead hydrostatic test of the new system piping passed.
Permit Ready to Issue  1/9/2014 DONE
DetailsChristina Prado
Issue and Print Permit  1/9/2014 DONE
DetailsChristina Prado
Inspection Record Card- Fire1/9/2014 1/9/2014 DONE
DetailsChristina Prado
Sprinkler Plan Check1/8/2014 1/8/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  1/8/2014 DONE
DetailsTim Frost
Sprinkler Plan Check1/6/2014 1/6/2014 FAIL
DetailsTim Frost
Miscellaneous action  1/6/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check12/18/2013 12/18/2013 FAIL
DetailsTim Frost
1st review completed  12/18/2013 FAIL
DetailsTim Frost
Miscellaneous action  12/18/2013 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Miscellaneous action  12/17/2013 DONE
Email Mike Gulley in regards to the use of the 10000 sq ft existing building. His reply is as followsL

The 10,000 square foot building is what we call a shop. It has many uses. We do not store inventory in the shop. We use it to put new product on ATV’s, Snowmobiles and motorcycles, so it can be tested outside. We also will throw picnic tables in the shop when we have events on our site to have a lunch for 150+ people. It was built as an attempt to get non warehouse stuff from our warehouse that was cramped, and give us a place to do the before mentioned stuff. Does that clarify the question?

Typically when we shrink wrap tires they are only wrapped around the pallet leaving the top open.


I have therefore, classified the area as OH II.
Miscellaneous action  12/12/2013 DONE
Randy,

I am no structural engineer. However, this sounds fine to me.

Please, have Sheldon add the detail to the drawing so that everyone will know where the hangers are to be installed.

Thanks you for your help and time in sorting this out.

Cordially,

Tim Frost, S.E.T.
Fire Sprinkler Plans Examiner
Fire Code Plans Examiner
Fire Inspector

City of Boise
tfrost@cityofboise.org
###-####

From: Randy Knutson [mailto:Randyk@Shilosprinkler.com]
Sent: Thursday, December 12, 2013 2:06 PM
To: Tim Frost
Cc: Sheldon Gray
Subject: FW: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe

Tim,
This is the response from the engineer.

Randy Knutson
Shilo Automatic Sprinkler, Inc.

From: Joe Lane [mailto:jlane@dcengineering.net]
Sent: Thursday, December 12, 2013 12:15 PM
To: Randy Knutson
Subject: RE: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe

Jason & Randy,

See attached detail.

The additional load of 250# is ok and was considered using the following rational: Concentrated load was applied to any single fire sprinkler support point, but not simultaneously at all support points. This load was not assumed to act concurrently with roof live load, snow, or wind.

Attachments made within 4” of the centerline of the panel point do not require the joist to be reinforced.
Supports should be to the top chord of the joist.

Joe Lane, PE, SE
###-####

From: Randy Knutson [mailto:Randyk@Shilosprinkler.com]
Sent: Thursday, December 12, 2013 10:50 AM
To: Joe Lane
Subject: RE: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe

Joe,
The hangers are 10.5Ft O.C. +/-. There will be 2 hangers per 21ft of pipe. Top beam clamp with a retaining strap on upper chord of joist.
Attachment similar to this:
http://www.afcon.org/pipe/100.pdf

Thank you,

Randy Knutson
Shilo Automatic Sprinkler, Inc.

From: Joe Lane [mailto:jlane@dcengineering.net]
Sent: Thursday, December 12, 2013 11:28 AM
To: Jason Hibbard; Randy Knutson
Subject: RE: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe

Randy,
What is the on center spacing of the piping attachment to the joist?

Joe Lane, PE, SE
###-####

From: Jason Hibbard [mailto:jason.hibbard@steedconstruction.com]
Sent: Tuesday, December 10, 2013 2:53 PM
To: Joe Lane
Subject: FW: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe

For your correspondence.

From: Randy Knutson [mailto:Randyk@Shilosprinkler.com]
Sent: Monday, December 09, 2013 5:53 PM
To: jason.hibbard@steedconstruction.com
Cc: Sheldon Gray
Subject: FW: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe

Jason,
I asked City of Boise if Joe Lane’s e-mail would suffice and the Plan Reviewer had a question.
Tim’s Response is as follows:
“Can you send me a copy of detail 9/S2.22 as mentioned in the email. Mr. Lane did not mention the additional 250# required by NFPA. Can you get him to email you that this additional load has been included in his calculations? ”

Tim also sent a copy of the NFPA 13 section as it applies:
“Unless the requirements of 9.2.1.3.3 apply, sprinkler piping shall be substantially supported from the building structure, which must support the added load of the water filled pipe plus a minimum of 250 lb (114 kg) applied at the point of hanging, except where permitted by 9.2.1.1.2, 9.2.1.3.3, and 9.2.1.4.1. (Ref: NFPA 13: 9.2.1.3.1 )
(Please, see NFPA 13: A.9.2.1. for more detailed reference information.)”

For my clarification on Detail 9 of S2.22, loads within 4” of the panel points will not require additional bracing?
Can we support off of the bottom chord?

Thanks,

Randy Knutson
Shilo Automatic Sprinkler, Inc.

From: Sheldon Gray
Sent: Monday, December 09, 2013 5:02 PM
To: Randy Knutson
Subject: FW: WPS Warehouse - RFI - Hanging 8", 6", and 4" water filled pipe



From: Jason Hibbard [mailto:jason.hibbard@steedconstruc
Miscellaneous action  12/12/2013 DONE
Continued -

The 4" & 6" main can be hung from the top chord of a joist provided the following occurs.
(2) hangers per piece 10.5' oc +-
Hangers to be within 4" of panel point of joist
Hung from the top chord with retainer strap
The 8" main must be trapezed
Plan assigned to (Tim)10/31/2013 10/31/2013 DONE
DetailsTim Frost
Miscellaneous action  10/31/2013 DONE
Rejected prescreen
Application received  10/25/2013 DONE
Application submitted via PDS Online on Oct 25 2013 3:57PM