INSP-Final Inspection | 1/16/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 12/19/2013 | 12/19/2013 | 12/27/2013 | P | PART |
Forrest France
|
|
|
Remainder of overhead work okayed for cover.
|
INSP-Sprinkler Rough-in | 12/23/2013 | 12/23/2013 | 12/23/2013 | A | PART |
Forrest France
|
|
|
Okay to cover remainder of overhead fire sprinkler work at the grid ceilings.
|
INSP-Sprinkler Rough-in | 12/3/2013 | 12/3/2013 | 12/4/2013 | P | PART |
Forrest France
|
|
|
Refer to plans for dated annotations. Overhead work okayed to cover with the exception of three heads to be relocated due to spacing issues, and two hangers at armovers. Also clouded one area at the north side area "A" not ready for cover approval.
|
INSP-Sprinkler Rough-in | 12/2/2013 | 12/2/2013 | 12/3/2013 | P | DEFR |
Forrest France
|
|
|
To 12/3
|
Plan assigned to (Tim) | 11/12/2013 | | 11/12/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/12/2013 | | 11/12/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/12/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/12/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 11/12/2013 | | 11/12/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 11/12/2013 | | DONE |
|
|
|
|
Application received | | | 11/7/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 7 2013 10:49AM
|