Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR13-00638
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1001 E PARKCENTER BLVD
Project NameGordmans #122 T.I.
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of changing pendent sprinklers to upright sprinklers to accommodate a new wall configuration. The existing main will be relocated 6’ east.

The fire sprinkler system is used for unlimited area of the building and for fire area. To prepare an existing 49,861 square foot tenant space for a new retail sales tenant. Permit BLD13-02316 was issued earlier to allow interior non-structural demolition and to allow the construction of an interior tenant demising wall to create this tenant space from a larger space. Work is to include 2 upgraded restrooms to be accessible to the disabled, interior nonbearing walls, 2 new double leaf exit doors including headers and landings, alterations to the roof to support roof top HVAC units, a loading dock, a ramp at the loading dock, guards on both sides of the loading ramp, added roof insulation for a total of R-20, mechanically fastened membrane roof covering, new exterior walls and parapets at the entry, interior finishes, wall furring and cavity insulation at some exterior walls, and interior display shelves. An elevated floor level (about 49 inches above the main level) having a floor area of about 176 square feet and a stairway to serve it will be constructed. Special Inspection is required for steel (including welding), concrete, masonry, soils, epoxy anchors, expansion anchors, and EIFS. A separate permit is required for free-standing display racks and shelving units exceeding 8 feet in height. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20142/24/20142/27/2014PCANC
DetailsCraig D. Hanson
was not ready
INSP-Final Inspection2/10/20142/11/20142/11/2014APART
DetailsForrest France
Rough-in work passed, final pending trade related permits and project finishes.
INSP-Sprinkler Rough-in12/2/201312/3/201312/4/2013PPART
DetailsForrest France
Overhead rough-in inspection completed- Refer to dated annotations on plans for areas in need of revision. Add missing head at the stock area SW corner, maintain coverage at the janitors room, pendents in the mens RR are at min. separation, provide coverage for the cart corral below the CCTV room, front entry vestibule and canopy are not yet constructed. Spacing adjustments at the NE wall okayed. Area separation walls to be full height in the stock room offices as discussed.
Issue and Print Permit  11/18/2013 DONE
Inspection Record Card- Fire11/18/2013 11/18/2013 DONE
DetailsTisha Gallop
Sprinkler Plan Check11/15/2013 11/15/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  11/15/2013 DONE
DetailsTim Frost
Plan assigned to (Tim)11/13/2013 11/13/2013 DONE
DetailsTim Frost
Sprinkler Plan Check11/13/2013 11/13/2013 FAIL
DetailsTim Frost
1st review completed  11/13/2013 FAIL
DetailsTim Frost
Application received  11/11/2013 DONE
Application submitted via PDS Online on Nov 11 2013 8:24AM