INSP-Final Inspection | 12/10/2013 | 12/10/2013 | 12/10/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Application received | | | 11/20/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 20 2013 11:55AM
|
Plan assigned to (Lee) | 11/20/2013 | | 11/20/2013 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 11/20/2013 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 11/20/2013 | | 11/20/2013 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/20/2013 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 11/20/2013 | | DONE |
Lee G Meredith
|
|
|
Emailed Dante requesting installation height of strobes. (application indicated ceiling height varies) He informed me that the height is less than 20 feet so no strobe de-rating will be required.
|
Issue and Print Permit | | | 11/20/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/20/2013 | | 11/20/2013 | | DONE |
Alexandra L. DeYoung
|
|
|
|