INSP-Final Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 | A | PASS |
Forrest France
|
|
|
Remainder of the scope of work completed. Final walkthrough passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 2/7/2014 | 2/7/2014 | 2/7/2014 | P | PART |
Forrest France
|
|
|
Cover inspection completed for bays 104A and 104B with the exception of one sprinkler not yet installed- ref. dated plan annotation.
|
CHANGE STATUS TO (ISS) | | | 2/7/2014 | | DONE |
Christina Prado
|
|
|
|
INSP-Final Inspection | 2/3/2014 | 2/4/2014 | 2/4/2014 | A | PART |
Forrest France
|
|
|
Fire sprinkler permit finaled. Inspection passed.
|
Sprinkler Plan Check | 1/16/2014 | | 1/16/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/16/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 1/16/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Scott) | | | 11/26/2013 | | DONE |
Bill Alexander
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 11/26/2013 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|