Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR13-00682
StatusFinaled
Name MOUNTAIN ALARM
Site Address 401 S 8TH ST
Project NameNorthrup Bldg FA Replacement
Customer Number 
ePlanReviewNo
Description
Replace existing fire alarm system & devices due to equipment failure. Install new AES dialer.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing9/11/20189/11/20189/11/2018PPASS
DetailsLee G Meredith
Tested elevator shunt power monitoring and flashing firemans hat in elevator. Waiting for as built drawings and record of completion.
DOC - Permit Finaled  9/11/2018 DONE
System passed inspection all required documents provided.
INSP-Final Inspection9/10/20189/11/20189/10/2018PCANC
DetailsJim Page
Building access is open, inspection technician is Ray McQueen Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
INSP-Final Inspection1/2/20181/3/20181/3/2018ACANC
DetailsTroy Cobbley
Ray McQueen will be the technician. ###-####. Building access 8-5. Phone #: ###-#### Inspection requested via web by Rose Peterson
INSP-Final Inspection12/18/201712/18/201712/18/2017PCANC
DetailsJim Page
Technician is Ray McQueen. Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
Miscellaneous action  8/22/2017 DONE
Sent Rose a request to complete this work so it can be closed. Rose responded to say they would have it complete by the end of the year.
Telephone call  7/15/2014 DONE
The property manager from Select Commercial called to discuss the requirements of elevator shunt trip power monitoring. I informed him that if there is a shunt trip feature that the power is required to be monitoried. I explained the reasoning behind the requirement and told him that his fire alarm contractor should be able to accomplish this.
INSP-Final Inspection6/24/20147/1/20147/1/2014AFAIL
DetailsTroy Cobbley
Need as-builts, need the 120 vac for the elevator monitored and the machine room smoke detector did not cause a flashing hat in the elevator car.
INSP-Final Inspection5/16/20145/20/20145/20/2014AFAIL
DetailsTroy Cobbley
See the city approved plans for locations and types of corrections needed. They include the need for addirional audio/visual devices and atleast one new smoke detector. Several wall mounted smoke detectors need relocated closer to the ceiling. As-builts are needed as well as the testing of the elevator recall, EOL's and fire sprinkler devices.
INSP-Conference3/24/20143/25/20144/4/2014ADONE
DetailsForrest France
Ray McQueen Phone #: ###-####
INSP-Conference3/20/20143/21/20143/21/2014ADEFR
DetailsForrest France
ray Phone #: ###-####
Issue and Print Permit  1/22/2014 DONE
Plan assigned to (Lee)12/3/2013 1/21/2014 DONE
DetailsLee G Meredith
Alarm Plan Check1/21/2014 1/21/2014 PASS
DetailsLee G Meredith
Plans approved with comments and red line notation.
PLANS TAKEN FRONT DESK ALARM  1/21/2014 DONE
Plans approved with comments and red line notation.
Permit Ready to Issue  1/21/2014  
Inspection Record Card- Fire1/21/2014 1/21/2014 DONE
DetailsDarla L Downs
Telephone call  1/21/2014  
1-21-14 called Brett Anderson permit ready and fee given ///dld
Plan resubmittals received  1/17/2014 DONE
DetailsTisha Gallop
received two copies; routed to LGM
1st review completed  12/5/2013 FAIL
DetailsLee G Meredith
1st review failed. See review comments and drawing red lines.
Miscellaneous action  12/5/2013 DONE
DetailsLee G Meredith
Emailed review comments to applicant.
Application received  12/3/2013