INSP-Final Inspection | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/3/2014 | 7/3/2014 | 7/3/2014 | P | PART |
Forrest France
|
|
|
Inspection for scope of work at the 4th and 5th floors-. 5th floor plans need revised to indicate changes to core area- elevator lobby, stair lobby, and restrooms only (no corridor at this time). 4th floor sprinkler finishes complete. Need to install ceiling tile at both 4th and 5th floor riser closets.
|
INSP-Sprinkler Rough-in | 4/17/2014 | 4/18/2014 | 4/18/2014 | A | PART |
Forrest France
|
|
|
4th floor corridor, janitors room, and storage rooms as marked on stamped plans with todays date okayed for cover.
|
INSP-Sprinkler Rough-in | 4/17/2014 | 4/17/2014 | 4/17/2014 | P | CANC |
Forrest France
|
|
|
Terry Nelson Phone #: ###-#### - - terry called in and canceled and reschuled for tomorrow morning /// 4-17-14 ps
|
INSP-Sprinkler Rough-in | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the 4th floor storage, mens and womens restrooms.
|
INSP-Sprinkler Rough-in | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | PART |
Forrest France
|
|
|
Okay to cover 4th and 5th floor elevator lobby sheetrock ceilings as marked and dated on approved plans.
|
INSP-Sprinkler Rough-in | 2/25/2014 | 2/26/2014 | 2/26/2014 | A | FAIL |
Troy Cobbley
|
|
|
The work that has been requested for inspection is covered with new sheet rock and is outside of the approved scope of work for the plans provided. No inspection performed.
|
INSP-Sprinkler Rough-in | 12/12/2013 | 12/12/2013 | 12/12/2013 | P | PART |
Forrest France
|
|
|
Okay to cover overhead work at the mens and womens restroom on the 5th floor as marked and dated on approved plans.
|
Plan assigned to (Tim) | 12/11/2013 | | 12/11/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/11/2013 | | 12/11/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/11/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/11/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 12/11/2013 | | 12/11/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 12/11/2013 | | DONE |
|
|
|
|
Application received | | | 12/10/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 10 2013 11:16AM
|