INSP-Final Inspection | 2/26/2014 | 2/26/2014 | 2/26/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | PART |
Forrest France
|
|
|
Project finishes underway.
|
INSP-Sprinkler Rough-in | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler work at the grid ceiling areas. Verified 401 coverage at restroom partitions. Need to remove foil at gym area upright heads.
|
INSP-Sprinkler Rough-in | 1/29/2014 | 1/29/2014 | 1/29/2014 | P | PART |
Forrest France
|
|
|
Inspection for cover at areas as marked on plans completed- refer to dated annotations on stamped drawings. Noted two overspaced heads, be aware of possible light fixture obstructions due to surface mounted lights not yet installed.
|
INSP-Sprinkler Rough-in | 1/14/2014 | 1/15/2014 | 1/15/2014 | P | PART |
Forrest France
|
|
|
Partial overhead for coverage at the sauna and shower rooms.
|
Permit Ready to Issue | | | 12/16/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 12/16/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 12/16/2013 | | 12/16/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 12/13/2013 | | 12/13/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/13/2013 | | 12/13/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/13/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/11/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 11 2013 11:36AM
|