INSP-Final Inspection | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Forrest France
|
|
|
Functional testing and final inspection passed. Previous C/N items finished. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 3/26/2014 | 3/26/2014 | 3/26/2014 | P | DEFR |
Forrest France
|
|
|
Scheduled in conjunction with related permit finals 3/27.
|
INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | NR |
Forrest France
|
|
|
Missing riser finish pack including calc stickers, DCVA certification, caps at FDC, sign at outside bell, riser tag, etc., need to complete forward flow, missing escutcheons.
|
INSP-Sprinkler Rough-in | 3/6/2014 | 3/6/2014 | 3/6/2014 | P | PART |
Forrest France
|
|
|
Overhead work at the grid ceiling areas completed to date okay for cover. Flex heads at some locations are not perpendicular to the ceiling and will need adjustment.
|
INSP-Sprinkler Rough-in/Hydro | 2/13/2014 | 2/14/2014 | 2/14/2014 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic testing passed. Noted spacing adjustments will be necessary at the east side offices and classrooms.
|
INSP-Sprinkler Rough-in | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line and post indicator including stub-in approved for cover.
|
Sprinkler Plan Check | 1/15/2014 | | 1/15/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/15/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 1/15/2014 | | 1/15/2014 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 1/15/2014 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/13/2014 | | 1/13/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/13/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 12/31/2013 | | 12/31/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/31/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/31/2013 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 12/30/2013 | | 12/30/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/16/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 16 2013 9:08AM
|