INSP-Final Inspection | 4/29/2014 | 4/30/2014 | 4/29/2014 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide signage on the riser room door as per the city approved plans.
|
INSP-Sprinkler Rough-in | 1/17/2014 | 1/21/2014 | 1/21/2014 | A | PASS |
Troy Cobbley
|
|
|
Piping is ok to cover. Two locations of tenting repaired while I waited.
|
INSP-Sprinkler Rough-in | 1/7/2014 | 1/7/2014 | 1/7/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has been performed.
|
Permit Ready to Issue | | | 12/23/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 12/23/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 12/23/2013 | | 12/23/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 12/20/2013 | | 12/20/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/20/2013 | | 12/20/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/20/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2013 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/18/2013 | | FAIL |
|
|
|
PreScreen
|
Application received | | | 12/16/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 16 2013 2:46PM
|