INSP-Final Inspection | 2/12/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Craig D. Hanson
|
|
|
Per Craig Hanson
|
DOC - Permit Finaled | | | 2/12/2014 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in | 1/21/2014 | 1/22/2014 | 1/22/2014 | A | FAIL |
Craig D. Hanson
|
|
|
Flex heads not attached to grid properly
|
Sprinkler Plan Check | 1/16/2014 | | 1/16/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/16/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/16/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 1/3/2014 | | 1/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/3/2014 | | 1/3/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 12/31/2013 | | 12/31/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/30/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 30 2013 2:10PM
|