INSP-Final Inspection | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 1/6/2014 | 1/6/2014 | 1/6/2014 | P | PART |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler modifications per the scope of work.
|
Plan assigned to (Tim) | 1/2/2014 | | 1/2/2014 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/2/2014 | | DEFR |
|
|
|
FIELD INSPECTOR
Please, verify that this is a gridded system. If not then a resubmittal will be required.
|
Sprinkler Plan Check | 1/2/2014 | | 1/2/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/2/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/2/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/2/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/2/2014 | | 1/2/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 12/31/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 31 2013 9:19AM
|