Case Summary | | | 4/7/2014 | | DONE |
|
|
|
|
INSP-Final Inspection | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
Plan resubmittals received | | | 3/26/2014 | | DONE |
|
|
|
Plan mod submittal received based on site inspection requirements.
|
Plan assigned to (Lee) | 3/26/2014 | | 3/26/2014 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 3/26/2014 | | 3/26/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/26/2014 | | DONE |
|
|
|
Plan modification review approved. Projectdox updated.
|
CHANGE STATUS TO (ISS) | | | 3/26/2014 | | DONE |
|
|
|
plan mod
|
INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need to add two audio/visuals and relocated another two and test. Provide as-builts.
|
Permit Ready to Issue | | | 1/7/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 1/7/2014 | | 1/7/2014 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 1/7/2014 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 1/6/2014 | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/6/2014 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 1/6/2014 | | 1/6/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
Plans approved. ProjectDox updated.
|
Application received | | | 1/2/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 2 2014 2:32PM
|