Case Summary | | | 6/3/2016 | | DONE |
|
|
|
|
Case Summary | | | 4/23/2014 | | |
|
|
|
|
INSP-Final Inspection | 3/25/2014 | 3/26/2014 | 3/26/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide map, provide secured power supply enclosure and change the text for the dialer trouble and the PIV as discussed.
|
CHANGE STATUS TO (ISS) | | | 1/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 1/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Lee) | 1/9/2014 | | 1/10/2014 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 1/10/2014 | | 1/10/2014 | | PASS |
Lee G Meredith
|
|
|
Plan Mod approved.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/10/2014 | | DONE |
|
|
|
Plan mod approved. Plans take to front desk for processing.
|
Permit Ready to Issue | | | 1/10/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/10/2014 | | 1/10/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 1/10/2014 | | DONE |
Christina Prado
|
|
|
called Robert to advise plan mod is ready and gave fees due
|
Plan resubmittals received | | | 1/9/2014 | | DONE |
Tisha Gallop
|
|
|
Plan Modification; Received two copies of sumbittal folder and plans, routed to LGM
|
Plan assigned to (Lee) | 1/2/2014 | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/6/2014 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 1/6/2014 | | 1/6/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
Approved plans take to front desk for processing
|
Inspection Record Card- Fire | 1/6/2014 | | 1/6/2014 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 1/6/2014 | | |
|
|
|
|
Issue and Print Permit | | | 1/6/2014 | | DONE |
|
|
|
|
Application received | | | 1/2/2014 | | |
|
|
|
|