INSP-Final Inspection | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Per conversation with Forrest France and documentation from Alarmco I am finaling this project.
|
Miscellaneous action | | | 7/7/2014 | | DONE |
|
|
|
I emailed Jason Heath to let him know his permit was about to expire. I informed him of the outstanding items and asked for an update. Jason called back to say that he believed everything was complete. I asked him to close out any loose ends with Forrest.
|
Case Summary | | | 4/7/2014 | | |
|
|
|
|
INSP-Final Inspection | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | PART |
Forrest France
|
|
|
Completed functional testing- Items noted include; waterflow at the SW riser reports as a low air supervisory, need to post signage at the door to the fire alarm panel room, provide record of completion forms. Remainder of inspection passed.
|
Permit Ready to Issue | | | 1/8/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/8/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/8/2014 | | 1/8/2014 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 1/7/2014 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 1/7/2014 | | 1/7/2014 | | PASS |
Lee G Meredith
|
|
|
Plans approved with comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/7/2014 | | DONE |
Lee G Meredith
|
|
|
plans approved. ProjectDox updated.
|
Plan assigned to (Lee) | 1/6/2014 | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 1/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 3 2014 11:58AM
|