INSP-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 | P | PASS |
Forrest France
|
|
|
Fire alarm testing passed. Permit finaled.
|
CHANGE STATUS TO (ISS) | | | 1/17/2014 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 1/17/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 1/17/2014 | | 1/17/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 1/16/2014 | | DONE |
|
|
|
Plan modification received adding smoke detection above a NAC panel in the secured room.
|
Alarm Plan Check | 1/16/2014 | | 1/16/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/16/2014 | | DONE |
Lee G Meredith
|
|
|
Plan modification approved. ProjectDox updated.
|
Permit Ready to Issue | | | 1/7/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/7/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/7/2014 | | 1/7/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 1/6/2014 | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
Emailed John Lopez asking if the balance of the building had notification or not.
|
Miscellaneous action | | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
Received email back from John indicating that his partner had been on site and understood the rest of the building was covered.
|
1st review completed | | | 1/6/2014 | | PASS |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 1/6/2014 | | 1/6/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/6/2014 | | DONE |
Lee G Meredith
|
|
|
Plans approved. ProjectDox updated.
|
Application received | | | 1/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 3 2014 12:16PM
|