INSP-Final Inspection | 2/21/2014 | 2/21/2014 | 2/21/2014 | A | PASS |
Forrest France
|
|
|
C/N items finished. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 2/20/2014 | 2/20/2014 | 2/20/2014 | A | PART |
Forrest France
|
|
|
Need to revise coverage at the server room due to new ductwork obstructions, check sprinkler in the adjacent office for damage, replace missing escutcheon at the conference room.
|
INSP-Final Inspection | 2/17/2014 | 2/18/2014 | 2/18/2014 | A | PART |
Forrest France
|
|
|
Remainder of fire sprinkler work completed- Final pending field ceiling tile installation.
|
INSP-Sprinkler Rough-in | 2/4/2014 | 2/4/2014 | 2/4/2014 | P | PART |
Forrest France
|
|
|
OH rough-in completed to date okayed for cover with the exception of two heads at unfinished ceiling east side.
|
INSP-Sprinkler Rough-in | 1/20/2014 | 1/21/2014 | 1/22/2014 | P | NR |
Craig D. Hanson
|
|
|
|
INSP-Sprinkler Rough-in | 1/14/2014 | 1/15/2014 | 1/15/2014 | P | FAIL |
Forrest France
|
|
|
Server room will need a drop ceiling or walls extended to the deck, overhead work has been covered prior to rough-in inspection.
|
Sprinkler Plan Check | 1/14/2014 | | 1/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 1/14/2014 | | 1/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 1/14/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 1/13/2014 | | 1/13/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 3 2014 5:00PM
|