INSP-Final Inspection | 4/4/2014 | 4/4/2014 | 4/4/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
CHANGE STATUS TO (ISS) | | | 3/10/2014 | | DONE |
Christina Prado
|
|
|
|
(F) Reprint permit | | | 3/10/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 3/6/2014 | | 3/6/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/6/2014 | | 3/6/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2014 | | DONE |
Tim Frost
|
|
|
|
INSP-Final Inspection | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/13/2014 | 2/14/2014 | 2/14/2014 | A | PASS |
Troy Cobbley
|
|
|
Plans are on site with Ben the Superintendant Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/23/2014 | 1/24/2014 | 1/24/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Plan assigned to (Tim) | 1/8/2014 | | 1/8/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/8/2014 | | 1/8/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/8/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 1/8/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/8/2014 | | 1/8/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 1/7/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 7 2014 7:46AM
|