Alarm Plan Check | 1/8/2014 | | 6/17/2014 | | DONE |
Lee G Meredith
|
|
|
|
INSP-Final Inspection | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Case Summary | | | 4/7/2014 | | |
|
|
|
|
INSP-Final Inspection | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PART |
Troy Cobbley
|
|
|
Will be ok to final when the new hvac units/duct smoke detectors are installed and tested. The existing devices functioned correctly
|
INSP-Final Inspection | 1/15/2014 | 1/17/2014 | 1/17/2014 | A | FAIL |
Troy Cobbley
|
|
|
Need hvac shut down wired up and tested.
|
Permit Ready to Issue | | | 1/16/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/16/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 1/15/2014 | | DONE |
|
|
|
Received Plan Mod. Ceiling mounted devices were not usable in some locations due to pre-existing conditions that interfered with proper placement so wall devices are being installed in those locations. Also, some existing, non required pull stations are being removed.
|
Alarm Plan Check | 1/15/2014 | | 1/15/2014 | | PASS |
Lee G Meredith
|
|
|
Plan mod approved.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/15/2014 | | DONE |
Lee G Meredith
|
|
|
Plan mod approved. ProjectDox updated.
|
INSP-Conference | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | DONE |
Troy Cobbley
|
|
|
I deferred steve to Lee for guidance on the existing manual pull stations.
|
Application received | | | 1/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 8 2014 12:26PM
|
Plan assigned to (Lee) | 1/8/2014 | | 1/8/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 1/8/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/8/2014 | | DONE |
Lee G Meredith
|
|
|
Plans approved. ProjectDox updated.
|
Permit Ready to Issue | | | 1/8/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/8/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/8/2014 | | 1/8/2014 | | DONE |
Christina Prado
|
|
|
|