INSP-Final Inspection | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work completed, final walkthrough passed. Permit finaled.
|
INSP-Final Inspection | 2/6/2014 | 2/6/2014 | 2/6/2014 | P | PART |
Forrest France
|
|
|
Phase one area sprinkler work passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2014 | 1/17/2014 | 1/17/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Sprinkler Plan Check | 1/16/2014 | | 1/16/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/16/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/16/2014 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 1/16/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 1/16/2014 | | 1/16/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 1/14/2014 | | 1/14/2014 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/14/2014 | | FAIL |
|
|
|
Prescreen
|
Application received | | | 1/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 10 2014 12:34PM
|