INSP-Final Inspection | 2/11/2014 | 2/12/2014 | 2/12/2014 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 2/4/2014 | 2/5/2014 | 2/5/2014 | P | PASS |
Troy Cobbley
|
|
|
Piping can be covered. Sprinkler rough-in passed.
|
INSP-Sprinkler Rough-in | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Will need another inspection to verify final placement of the pendant heads
|
Permit Ready to Issue | | | 1/17/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 1/17/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/17/2014 | | 1/17/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 1/15/2014 | | 1/15/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/15/2014 | | 1/15/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/15/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/14/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 14 2014 3:28PM
|