INSP-Final Inspection | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/6/2014 | 2/7/2014 | 2/7/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping ok to cover
|
INSP-Sprinkler Rough-in | 2/7/2014 | 2/7/2014 | 2/7/2014 | P | FAIL |
Troy Cobbley
|
|
|
Access door was locked. Employees would not allow access. Rescheduled for this afternoon if possible.
|
Permit Ready to Issue | | | 1/30/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 1/30/2014 | | 1/30/2014 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 1/30/2014 | | DONE |
|
|
|
|
Application received | | | 1/29/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2014 11:42AM
|
Plan assigned to (Tim) | 1/29/2014 | | 1/29/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/29/2014 | | 1/29/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/29/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2014 | | DONE |
Tim Frost
|
|
|
|