INSP-Final Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | CANC |
Troy Cobbley
|
|
|
Not ready for final due to alarm issues
|
INSP-Sprinkler Rough-in | 5/28/2014 | 5/28/2014 | 5/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead rough-in passed for the 4" wet system from the riser room to the new "infill".
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test of the 4" wet system passed
|
INSP-Sprinkler Rough-in | 5/19/2014 | 5/19/2014 | 5/19/2014 | P | PASS |
Troy Cobbley
|
|
|
Piping above the lay in ceilings on the first and second floors is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2014 | 4/8/2014 | 4/8/2014 | P | PASS |
Troy Cobbley
|
|
|
First and second floor rough-in and overhead hydro passed for the In-Fill
|
Plan assigned to (Tim) | 2/3/2014 | | 2/3/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/3/2014 | | 2/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/3/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 2/3/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/3/2014 | | 2/3/2014 | | DONE |
Darla L Downs
|
|
|
|
(F) Reprint permit | | | 2/3/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/3/2014 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/3/2014 | | |
|
|
|
|
Application received | | | 1/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 30 2014 3:50PM
|