INSP-Final Inspection | 3/7/2014 | 3/10/2014 | 3/10/2014 | A | PASS |
Forrest France
|
|
|
C/N items verified. Fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in | 3/5/2014 | 3/6/2014 | 3/6/2014 | P | PART |
Forrest France
|
|
|
Fire sprinkler work at the front office areas passed inspection. Need to add hangers at three branchlines to new heads in the tool crib. Noted missing coverage below the overhead door at the tool storage bay north end of the building adjacent to the tool crib.
|
Permit Ready to Issue | | | 2/11/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 2/11/2014 | | 2/11/2014 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 2/11/2014 | | DONE |
|
|
|
|
Application received | | | 2/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 10 2014 10:10AM
|
Plan assigned to (Tim) | 2/10/2014 | | 2/10/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/10/2014 | | 2/10/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/10/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2014 | | DONE |
Tim Frost
|
|
|
|