INSP-Final Inspection | 4/16/2014 | 4/17/2014 | 4/18/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough.
|
INSP-Sprinkler Rough-in/Hydro | 4/1/2014 | 4/2/2014 | 4/2/2014 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic test of the new 4" and 6" mains completed satisfactory.
|
Issue and Print Permit | | | 3/18/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 2/20/2014 | | 2/25/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 2/20/2014 | | 2/25/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/25/2014 | | 2/25/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/25/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/25/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/25/2014 | | 2/25/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/25/2014 | | DONE |
|
|
|
called Paul and told him permit is ready and fee due.
|
Application received | | | 2/20/2014 | | |
|
|
|
|