Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR14-00115
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 4321 S KENNEDY ST
Project NameWESTERN AIR EXISTING HANGAR#2
Customer NumberDOOR HGT IS 30'
ePlanReviewYes
Description
The fire sprinkler scope of work consists of a deluge 3% AFFF foam system for an existing type I aircraft hangar. There is also a supplemental foam hose system. The system is supply by a existing 250,000 Gal water storage tank, (3) existing 1500 Gpm @ 120 Psi pumps in parallel, (2) 1300 Gal bladder foam tanks (one primary and one back up) with 8” ratio controllers and 8” deluge valve. The foam concentrate line is actuated by a 2½” water powered ball valve. The compound 6”x4”x4”x 2½” grid is supplied by an 8” & 6” feed main. There is also column protection.

Note: There are two existing foam systems off the same header.

There is no direct building permit for this project. The project is required due to BLD13-02244 creating one large building. Please, see below.

Western Aircraft - Shop and Office Addition - To construct an 11,465 square foot, two story, pre-engineered metal building shop, storage and office building addition between two existing aircraft hangars. This will create one large building with a three-hour firewall separating the new addition from the north existing hangar, creating separate buildings for allowable area and allowed nonseparated uses. This building is fully fire sprinklered. The sprinklers are used for area increase. This permit also includes related site improvements. All construction per the approved plans attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/4/201411/4/201411/4/2014PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection10/23/201410/30/201410/30/2014PPART
DetailsTroy Cobbley
The required full flow of the deluge system in the existing hangar #2 passed inspection.
INSP-Conference9/25/20149/25/20149/25/2014ADONE
DetailsTroy Cobbley
This inspection is for foam proportioner flow at riser room only. It was verified that a 3% concentration had been achieved. Document to be emailed to Tim for attachment to case.
INSP-Sprinkler Rough-in/Hydro8/7/20148/8/20148/8/2014APASS
DetailsTroy Cobbley
Overhead hydro test of the existing hanger passed
INSP-Sprinkler Rough-in/Hydro7/24/20147/24/20147/24/2014PPASS
DetailsTroy Cobbley
Hydro test of the hose valves passed
Miscellaneous action  7/17/2014 DONE
Hydraulic calculations were verified for the columm protection.
INSP-Sprinkler Rough-in7/9/20147/10/20147/10/2014APASS
DetailsTroy Cobbley
See the city approved plans for the sheets marked "ok" where the rough-in has passed. Additional fittings and elevation change needs to be addressed as well as one missing EQ brace. A "Big A**" Ceiling fan is being installed that may be an issue with sprinkler discharge.
INSP-Sprinkler Rough-in7/9/20147/9/20147/9/2014PCANC
DetailsTroy Cobbley
Overbooked. Per rick will be rescheduled for tomorrow.
Sprinkler Plan Check6/26/2014 6/26/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/26/2014 DONE
DetailsTim Frost
Permit Ready to Issue  6/26/2014 DONE
DetailsCandy A. Nichols
Issue and Print Permit  6/26/2014 DONE
DetailsCandy A. Nichols
(F) Reprint permit  6/26/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Fire6/26/2014 6/26/2014 DONE
DetailsCandy A. Nichols
Miscellaneous action  3/4/2014 PEND
I could not approve this project because I do not have the detection/releasing system drawings. However, the fire protection drawings are fine.
Early Start  3/3/2014 PASS
Sprinkler Plan Check2/28/2014 2/28/2014 FAIL
DetailsTim Frost
1st review completed  2/28/2014 FAIL
DetailsTim Frost
Miscellaneous action  2/28/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)2/27/2014 2/27/2014 DONE
DetailsTim Frost
Application received  2/26/2014 DONE
Application submitted via PDS Online on Feb 26 2014 10:39AM