INSP-Final Inspection | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/23/2014 | 10/30/2014 | 10/30/2014 | P | PART |
Troy Cobbley
|
|
|
The required full flow of the deluge system in the existing hangar #2 passed inspection.
|
INSP-Conference | 9/25/2014 | 9/25/2014 | 9/25/2014 | A | DONE |
Troy Cobbley
|
|
|
This inspection is for foam proportioner flow at riser room only. It was verified that a 3% concentration had been achieved. Document to be emailed to Tim for attachment to case.
|
INSP-Sprinkler Rough-in/Hydro | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test of the existing hanger passed
|
INSP-Sprinkler Rough-in/Hydro | 7/24/2014 | 7/24/2014 | 7/24/2014 | P | PASS |
Troy Cobbley
|
|
|
Hydro test of the hose valves passed
|
Miscellaneous action | | | 7/17/2014 | | DONE |
|
|
|
Hydraulic calculations were verified for the columm protection.
|
INSP-Sprinkler Rough-in | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the sheets marked "ok" where the rough-in has passed. Additional fittings and elevation change needs to be addressed as well as one missing EQ brace. A "Big A**" Ceiling fan is being installed that may be an issue with sprinkler discharge.
|
INSP-Sprinkler Rough-in | 7/9/2014 | 7/9/2014 | 7/9/2014 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Per rick will be rescheduled for tomorrow.
|
Sprinkler Plan Check | 6/26/2014 | | 6/26/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/26/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 6/26/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 6/26/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 6/26/2014 | | 6/26/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Miscellaneous action | | | 3/4/2014 | | PEND |
|
|
|
I could not approve this project because I do not have the detection/releasing system drawings. However, the fire protection drawings are fine.
|
Early Start | | | 3/3/2014 | | PASS |
|
|
|
|
Sprinkler Plan Check | 2/28/2014 | | 2/28/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/28/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/28/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 2/27/2014 | | 2/27/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/26/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 26 2014 10:39AM
|