INSP-Final Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | A | PASS |
Jim Page
|
|
|
Final underground supply inspection has been completed, permit is finaled.
|
FIR-Aging Inspection | 12/18/2018 | 12/18/2018 | 12/24/2018 | | CANC |
Jim Page
|
|
|
Project is still under construction.
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | CANC |
Jim Page
|
|
|
Reuqest was for a main line flush, this request is cancelled and the correct request was generated.
Jeremy Phone #: ###-####
|
INSP-Supply line flush | 7/17/2018 | 7/17/2018 | 7/17/2018 | A | DONE |
Jim Page
|
|
|
Main line flush complete.
|
INSP-Supply line flush | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | FAIL |
Jim Page
|
|
|
Could not get water through the underground supply, main flush will need to be rescheduled.
Jeremy Phone #: ###-####
|
FIR-Aging Inspection | 4/5/2018 | 4/5/2018 | 4/6/2018 | | CANC |
Jim Page
|
|
|
Project is still under construction.
|
INSP-Sprinkler Rough-in | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | PART |
Forrest France
|
|
|
Inspection for UG fire supply line completed at five exposed locations. Okayed for cover.
|
Sprinkler Plan Check | 3/4/2014 | | 3/4/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/4/2014 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 3/4/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/4/2014 | | 3/4/2014 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 3/3/2014 | | 3/3/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/3/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/3/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 2/28/2014 | | 2/28/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/27/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 27 2014 9:29AM
|