INSP-Final Inspection | 4/3/2014 | 4/4/2014 | 4/4/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. There are multiple painted heads mike and I noted.
|
Plan assigned to (Tim) | 3/11/2014 | | 3/11/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/11/2014 | | 3/11/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/11/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/11/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/11/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/11/2014 | | 3/11/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 3/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 5 2014 11:40AM
|