Case Summary | | | 2/2/2015 | | |
|
|
|
|
INSP-Final Inspection | 6/16/2014 | 6/18/2014 | 6/18/2014 | A | PASS |
Forrest France
|
|
|
Fire alarm testing completed satisfactory. Permit finaled. Noted corrections finished.
|
INSP-Final Inspection | 5/13/2014 | 5/14/2014 | 5/14/2014 | P | FAIL |
Craig D. Hanson
|
|
|
system would not reset after tests due to a fault with Centurytel.
|
INSP-Alarm Testing | 5/5/2014 | 5/5/2014 | 5/5/2014 | A | DONE |
Forrest France
|
|
|
Verified air flow measurements per HVAC contractor at the duct smoke detector using a Fluke 922 meter and pitot.
|
INSP-Conference | 4/14/2014 | 4/17/2014 | 4/17/2014 | P | DONE |
Forrest France
|
|
|
On site conference regarding duct smoke detection for HVAC shutdown.
|
Application received | | | 3/12/2014 | | |
|
|
|
|
Plan assigned to (Lee) | 3/12/2014 | | 3/12/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 3/12/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 3/12/2014 | | 3/12/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 3/12/2014 | | DONE |
|
|
|
Plans approved with comments and taken to front desk for processing.
|
Telephone call | | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
called Chris to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/12/2014 | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/12/2014 | | DONE |
Christina Prado
|
|
|
|