INSP-Final Inspection | 6/6/2014 | 6/9/2014 | 6/9/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2014 | 5/22/2014 | 5/22/2014 | P | PART |
Forrest France
|
|
|
Overhead work per the scope of work okay for ceiling cover. One head location adjusted while on site. Hydrostatic test at system working pressure passed.
|
Permit Ready to Issue | | | 3/18/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/18/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/18/2014 | | 3/18/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 3/17/2014 | | 3/17/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/17/2014 | | 3/17/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/17/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/17/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 3/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2014 1:09PM
|