INSP-Final Inspection | 5/23/2014 | 5/27/2014 | 5/27/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/23/2014 | 5/27/2014 | 5/23/2014 | P | CANC |
Troy Cobbley
|
|
|
Final Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 5/20/2014 | 5/21/2014 | 5/21/2014 | A | PASS |
Troy Cobbley
|
|
|
The remaining overhead rough-in passed and all ceiling tile is ok to install. Also the overhead hydro test passed.
|
INSP-Sprinkler Rough-in | 4/22/2014 | 4/23/2014 | 4/23/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough to cover on all existing ceilings ( grid and hard lids ) as marked on the plans is ok to cover.
|
INSP-Sprinkler Rough-in | 4/9/2014 | 4/10/2014 | 4/10/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations marked "ok" where piping is ok to cover.
|
INSP-Sprinkler Rough-in | 4/8/2014 | 4/9/2014 | 4/9/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed piping can be covered.
|
Override - Parcel Holds | | | 3/21/2014 | | |
|
|
|
|
Issue and Print Permit | | | 3/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Override - Parcel Holds | | | 3/21/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 3/21/2014 | | 3/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 3/20/2014 | | 3/20/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/20/2014 | | 3/20/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/20/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/20/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 3/18/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 18 2014 2:34PM
|