INSP-Final Inspection | 4/28/2014 | 4/28/2014 | 4/28/2014 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Sprinkler Rough-in/Hydro | 4/23/2014 | 4/25/2014 | 4/25/2014 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Final walkthrough passed.
|
INSP-Sprinkler Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 3/24/2014 | 3/24/2014 | 3/24/2014 | P | NR |
Forrest France
|
|
|
Stefan is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
Sprinkler Plan Check | 3/24/2014 | | 3/24/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/24/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/24/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 3/24/2014 | | 3/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 3/21/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 21 2014 8:32AM
|
Plan assigned to (Tim) | 3/21/2014 | | 3/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/21/2014 | | 3/21/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/21/2014 | | FAIL |
Tim Frost
|
|
|
|