INSP-Final Inspection | 6/12/2014 | 6/13/2014 | 6/13/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 5/27/2014 | 5/27/2014 | 5/27/2014 | P | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the grid ceilings in the common corridor and tenant space areas.
|
INSP-Sprinkler Rough-in | 5/1/2014 | 5/1/2014 | 5/1/2014 | P | PART |
Forrest France
|
|
|
Overhead work completed to date okayed for cover.
|
INSP-Sprinkler Rough-in | 4/23/2014 | 4/23/2014 | 4/23/2014 | P | PART |
Forrest France
|
|
|
Overhead work at the sheetrock soffits approved for cover. Verified upright coverage throughout.
|
Plan assigned to (Tim) | 4/2/2014 | | 4/2/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/2/2014 | | 4/2/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 4/2/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 4/2/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 4/2/2014 | | 4/2/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/2/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 4/2/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/2/2014 | | 4/2/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 4/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 1 2014 7:52AM
|