Case Summary | | | 4/23/2014 | | |
|
|
|
|
INSP-Final Inspection | 4/10/2014 | 4/11/2014 | 4/11/2014 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 4/9/2014 | 4/10/2014 | 4/10/2014 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for room locations marked "ok" where piping is ok to cover.
|
INSP-Final Inspection | 4/8/2014 | 4/9/2014 | 4/9/2014 | A | FAIL |
Troy Cobbley
|
|
|
Wiring needs to be in rigid conduit and the signal strengh did not meet the minimum requirements.
|
Miscellaneous action | | | 4/9/2014 | | DONE |
|
|
|
I emailed Rob Gobler to let him know that "Rigid" conduit will be required on the installation, as noted in the review comments, unless he provides documentation from the manufacturer that indicates otherwise.
|
Issue and Print Permit | | | 4/4/2014 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 4/1/2014 | | 4/3/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 4/3/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 4/3/2014 | | 4/3/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 4/3/2014 | | DONE |
|
|
|
Approved plans with review comments taken to front desk for processing.
|
Inspection Record Card- Fire | 4/3/2014 | | 4/3/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 4/3/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 4/1/2014 | | |
|
|
|
|